SIRS & Milestone Inspections — What PCB Condo Buyers Must Know
In the aftermath of the Champlain Towers collapse in Surfside, Florida passed Senate Bill 4-D, which created two separate requirements that are often referred to as one. The first is a milestone structural inspection, required for any condominium building that is 3 stories or taller and has reached 30 years of age (25 years if within 3 miles of the coastline). The second is a Structural Integrity Reserve Study (SIRS) — not an inspection, but a reserve study that sets how much the association must hold for major structural components.
In Panama City Beach, that 3-mile coastal threshold covers virtually every condo building on the beach and most inland complexes. If you’re buying in a building built before roughly 2001, the inspection is either already required, in progress, or overdue.
What the Inspection Covers
A milestone inspection is a visual and structural assessment performed by a licensed engineer or architect. It evaluates:
- Load-bearing walls and structural frames
- Concrete condition (spalling, exposed rebar, corrosion — common in saltwater environments)
- Balcony and walkway structural integrity
- Roofing systems
- Waterproofing and exterior envelope
- Parking structures and foundations
The engineer classifies findings by severity, and the association must fund repairs through reserves or assessments.
How SIRS Affects Your Purchase
As a buyer, SIRS changes three things:
- Building value: A building that passed its milestone inspection with clean findings is more attractive to buyers and lenders. A building with significant findings — or one that hasn’t completed the inspection yet — carries uncertainty that suppresses prices.
- Reserve requirements: As of December 31, 2024, associations can no longer vote to waive reserve funding for SIRS structural components. HB 913 (2025) added flexibility — boards can use credit lines and phased funding, and may pause certain SIRS funding under specific conditions tied to funding Milestone-recommended repairs — but the obligation to fund is mandatory. Buildings that had been waiving reserves are now facing HOA fee increases to catch up.
- Lender requirements: Many lenders now require proof of SIRS compliance or a timeline for completion before approving condo loans. Buildings that are non-compliant may only qualify for portfolio or cash purchases.
Which PCB Buildings Are Affected
All gulf-front condos on PCB are within 3 miles of salt water, so the 25-year coastal Milestone trigger applies (not the 30-year inland threshold). Buildings from the mid-2000s are approaching that threshold now; older towers are already past it. No association reliably discloses a completed SIRS report, reserve balance, or percent-funded figure to the public — this information has to be obtained directly through the seller, association manager, or estoppel package.
What to Ask Before Buying
- Has the building completed its milestone inspection? If so, request a copy of the engineering report.
- Were any critical or significant findings identified?
- Has the association funded the required repairs? Through reserves or a special assessment?
- If the inspection hasn’t been completed, what is the timeline? Is the association in compliance with the deadline?
- Has the SIRS resulted in any changes to HOA fees or reserve contributions?
Key Takeaways
- SIRS affects virtually every PCB condo building 3+ stories. The Milestone Inspection trigger is 25 years for coastal buildings within 3 miles of salt water (Fla. Stat. § 553.899(3)(b))
- A clean inspection report is a green light — it means the building is structurally sound and properly funded
- Outstanding or failed inspections mean uncertainty — possible assessments, lender restrictions, and resale challenges
- Ask for the engineering report before making an offer, not after
- SIRS is reshaping PCB condo values — well-maintained buildings are separating from deferred-maintenance buildings